Home Page

Knitting Gallery

WIP's Gallery
(and UFO's)


Last Week's Blog

Links


My  Game  Blog

Fitness Park
I will not discrimate against a yarn based on it's color, fiber, manufacturer, or retail outlet.
Knit Alongs
Friday, May 27, 2005
posted 8:23 AM EST
Starting TBD
Did you ever have a perfect day? One where you got to enjoy beautiful weather, have fun, while spending the day with your loved one? Yesterday was one of those days (I hear all my Stitch n Bitcher's saying "beautiful weather? yesterday?... but it was dreary and cold... like it's been all week).

Well, it was warm, sunny and beautiful at
Hershey Park yesterday (and I have the sunburn to prove it). The crowds haven't quite hit yet, so the park was wonderful. Lines were fairly short and the people were all very pleasant. There were a lot of school trips and the kids were all well behaved. I'm sure the beautiful weather and short lines kept everyone's temperment in good order.

Since I get motion sick fairly easily, I keep my rides to the occassional, and usually later in the day. So I watched Matt ride every single roller coaster (sadly, except the Superdooperlooper which broke down while he was standing in line. If he had been one group in front he would've been stuck on the ride! Yikes!). His favorite was The Great Bear, which he loved the last time we were there, but they put in a new coaster last year, the "The Storm Runner" which he said was okay, but he still like The Great Bear better.

We weren't dressed for such great weather (did I mention that it's been cold, rainy and just basically dreary here?) I had a turtleneck on and Matt wore a long sleeve tee (but that was as much to protect the road rash from his crash on Saturday). Everyone else had on shorts, tees and other lovely summery clothing. It was warm enough that the water rides were open and getting good use.

So yes, it was a perfect day.

Well, not much knitting done. I did think about it (especially whether I was going to bind off the back neck for Matt's Cable O's vest) and I had decided to do it when I got home and read
Larry's comment from yesterday, which basically summed up all the things I had been thinking about. I just think in the long run binding off gives the garment a little more stability, especially with the cotton. Since it doesn't have sleeves, I'm sure it's not as much of an issue, but it's not going to "hurt" it to bind it off, but I see potential issues if I don't bind it off...

So... are we ready to start a "Spring Forward Knit along"?
Starting 3/15/05
Starting 3/15/05
Finshied 4/7/05
Finished 1/3/05
Current WIPs
Diamond Patch Sweater
Spring Forward Cardigan
Cropped Cardigan II
Cable O's Vest
Leisure Arts Sampler Afghan

Recently Finished
Cozy Shawl Collared Aran
Cross Over Top
Denim Socks
Thanks to Matt at
Crowing Ram
for the button.
Kate
Kristi
Jacq
Lauren
Nicole
Rosie
sUsAn
Be an Alex's SuperStar!
Donate to the
JDRF Walk For A Cure
Thursday, May 26, 2005
Some Favorite Blogs posted 7:35 AM EST
Just a quick post before Matt and I head out for the day. I got the back finished on the Cable O's Vest.
The back neck stitches are left live then picked up, but I'm debating if I should bind them off. Since I'm doing mine in cotton (the pattern sample was done in Cascade 220) and it's really a cable rib pattern, I'm afraid the neck will stretch out while Matt's wearing it. Any opinions?

Speaking of
Twists & Turns, my Summer issue arrived yesterday. I'm thinking both sweaters are on my "To Do" list. The Blue Bark Pullover may get swatched up with some of my precious Cascade Key Largo stash....
Wednesday, May 25, 2005
posted 8:10 AM EST
Well, the ends still aren't woven in on the afghan. I did move it so it didn't become a permanent doggie bed (yes, all the Project Linus blankets get a good washing right before they leave the house... not that the car is much less dog hair free).

So I fiddled around with some things yesterday. I worked a little on the Cropped Cardigan II. (you'll remember this is a Paton's pattern from the booklet Canadian Living. I did the
first one in Bartlett Yarns and this one is in alpaca. The Bartlett one is way too large for me now... I made it 60 lbs ago). I love the pattern and wore the sweater a lot. The problem is the back is solid moss stitch. Fine for mindless knitting, but can get tedious if I work too long on it.

So I'm better than halfway thru the armhole section. Once the back is done, the sleeves and fronts will be more interesting to knit (yeah cables!!) and there's no front bands (the buttonholes are worked into the moss stitch). It really is a lovely little pattern. The really interesting thing is that the two sweaters are going to look nothing alike thanks to the different yarn. BTW: the Peruvian Pure Alpaca from Elann is lovely to work with.

I did do a few more rows on the
Cable O's Vest for Matt. As a matter of fact, I think I can get the back done today.

I also spent some time just playing with a few other things. I swatched a couple of wools from stash to make a Fall Back Cardigan. The
Spring Forward Cardigan is a complete mind block. I think that I'm having a problem with a: I don't really like working cables with cotton and b: I was so far on the first one when I had to frog it due to it being the wrong size. So I figured this isn't the pattern's fault, so why not just start fresh and see what wools I have to make a lovely wool cardigan...

Oh, and I have the saddles done on Matt's
Happy Husband sweater (the Jo Sharp Silkroad Aran is like knitting with butter... in a good way, because I'm guessing knitting with butter isn't really pleasant. It would melt and be all greasy and slippery.... anyway, let's jus say the yarn is delightful to knit!)

So I bounced from project to project yesterday. I expect to do the same today.
<< Purling Puppy Webring! >>
Knitting Bloggers
Previous | Next
Tuesday, May 24, 2005
posted 8:00 AM EST
I'm definitely on a crochet kick right now. The second Project Linus afghan is done... except for the weaving in ends.
Any volunteers????

I like the pattern a lot (my first ripple afghan... now I know why it's so popular. It's easy and fast, and looks better than just a basic double crochet stitch), but dang, those are a lot of ends to weave in.
The 10th block for the Leisure Arts Sampler Afghan. Super fast and simple. This is the block Matt chose and I think it turned out well. I did start block #11, but it's got a lot of cables, so it won't get finished as quickly as the last couple of ones.

I only used about half the yarn I had bought to make the ripple afghan, so I started an other afghan for Project Linus. (this one has fewer stripes, so less ends to weave in...)

I am going thru a little wool withdrawl. I'm working either in acrylic (the afghans) or cotton (Matt's
Cable O's Vest). I'm thinking I may spend some time today with a little wool just for the pleasure of working with it. Hmmm, wonder if that includes alpaca? I wouldn't mind working a bit on the cropped cardigan (all that moss stitch... best in small doses anyway).

UPDATE:
Gena came up with a solution for weaving in the ends...
She thinks woven in ends are over rated... why bother? It's just as comfy to sleep on now!
Monday, May 23, 2005
posted 7:46 AM EST
The problem with Matt racing in the Cat 5 (the "beginning" level of cycling... all riders must start as a Cat 5), is that you get a lot of riders not used to pack riding. Matt and his riding partner controlled the race, and his friend (who is the number one ranked Cat 5 rider in the state) finished second. Matt was all ready for a top 5 finish when someone tried to pass him, but didn't have good handling skills and crashed into Matt. Since his bike was unridable, Matt had to carry his bike over the finish line and he lost his top 5 finish. Matt has not had good luck with racing. His best finish got screwed up (they mixed up racer's numbers and didn't post Matt's finish at all... one of his friends finished 4th and also didn't get credit. So they both didn't receive points to be able to move up to the next Cat).

Fortunately, Matt wasn't seriously hurt (some bruising and a little road rash... he's had worse crashes) and he has fixed the bike.

The knitting content is thin, as I'm still just doing the same old stuff. I finished up one of the Project Linus blankets and plugging away on the second (almost done). I finished up an afghan square and started an other. I have about 2 or 3 repeats to go on the back of the Cable O's Vest.